Search

Search

Protecting the quality of life since 1944.

Search

Explore:

Categories:

Midtown Beach Repair Groin

Midtown Beach Repair Almost Completed

The Midtown beach repair is almost completed with a new groin installed and fresh sand to renourish the beach in front of the seawall.

It appears that the only part of the project remaining is to install a new stairway down to the beach and remove the lane dividers on Ocean Blvd.

You may recall the extreme beach erosion that happened during last season from several storms:

 10/26/2017 File Footage – Civic Association Video [52 sec.]

10-26-2017 Midtown Beach Erosion Conditions from Palm Beach Civic Association on Vimeo.

Last Fall waves were breaking over the seawall at hi-tide and at low-tide, there wasn’t much beach remaining.  The stairway was still in place but beach patrons were blocked from using it because it was unsafe.

Stay Connected

By submitting this form, you are consenting to receive marketing emails from: Palm Beach Civic Association, 139 North County Road, Paramount Theater Building, # 33, Palm Beach, FL, 33480, US, http://www.palmbeachcivic.org. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email.

Emails are serviced by Constant Contact.

© 2022 Palm Beach Civic Association. All rights reserved.