Search

Search

Protecting the quality of life since 1944.

Search

Explore:

Categories:

Flagler Bridge with drawbridge up Aerial

Flagler Bridge Taken Over by FDOT

The Florida Department of Transportation (FDOT) took over the Flagler Memorial Bridge from the contractor on October 4 because it had gone 60 days without a malfunction.

On Saturday, the Palm Beach Police reported that the drawbridge malfunctioned around 2:50 p.m., closing for several hours. By 5 p.m. the bridge reopened.

The source of the problem was not immediately known.

FDOT is now fully responsible for the operation, repair, and maintenance of the bridge.

Stay Connected

By submitting this form, you are consenting to receive marketing emails from: Palm Beach Civic Association, 139 North County Road, Paramount Theater Building, # 33, Palm Beach, FL, 33480, US, http://www.palmbeachcivic.org. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email.

Emails are serviced by Constant Contact.

© 2022 Palm Beach Civic Association. All rights reserved.